
✔ Permit drawings & submission handled
✔ Code-compliant layouts & planning
✔ FREE 3D Design + Detailed Scope
Not sure if permits are required
Drawings don’t meet city requirements
Delays due to rejected applications
Layout doesn’t meet building codes
Contractors start work without proper approvals
We handle permit drawings and submissions for you
We design layouts that meet Toronto building code requirements
We prevent delays with properly prepared documentation
We ensure your project is approved before construction begins
We guide you through the entire process — step by step


Full 3D visualization of your space
Clear understanding of layout and design
Ability to make changes before construction
Confidence in final outcome
Accurate floor plans and layouts
Code-compliant design and measurements
Submission-ready permit drawings
Faster approval process


Custom millwork includes built-in cabinets, shelving, feature walls, and storage designed specifically for your space.
We use proper insulation systems, vapor barriers, and moisture control methods behind walls and floors — not just surface fixes.
Yes. We design layouts suitable for rental use and can guide you on legal requirements and space planning.
Most basement projects take 3–6 weeks, depending on size and complexity.
Our quotes are detailed and fixed based on finalized 3D designs — so you don’t deal with unexpected costs later.

© Copyright 2026. ASASA Construction. All Rights Reserved.